Support decision​

Publishing systemVersionsStudio tierRequired acceptance
OJS3.5.0-4, 3.5.0-5, 3.5.0-6Stable acceptance scopeThree version-specific E02 jobs/archives and three manual gates.
OMP3.5.0-4, 3.5.0-5, 3.5.0-6PreviewAll three E02 regression jobs/archives are mandatory; this does not promise Stable OMP feature coverage.

This explicitly refines ADR-010 and ADR-019. A Preview feature is not generally release-blocking, but the declared six-target PKP regression matrix is a required release contract. Missing, failed, skipped, cancelled, stale or foreign-SHA evidence for any declared target blocks E02. Privacy, security and data-loss defects remain blocking for every tier. Existing checks are retained without continue-on-error.

The connector discovers capabilities and uses existing signed application protocols. Installed plugin version, server-advertised capability and user/assignment permissions determine executable functions; a supported version alone grants no access. OJS/OMP remain authoritative for their workflow, decisions, review completion and private files. No OMI schema/container, API-v1, credential or database contract changes.

Manual acceptance​

The current v1 receipt requires exactly 14 manual gates, including ojs-3.5.0-4, ojs-3.5.0-5 and the new ojs-3.5.0-6. All start pending. Each OJS acceptance requires the selected source SHA, an actual observation timestamp and a redacted HTTPS evidence reference; record the external plugin SHA and exercised scopes in that evidence. Automated green jobs do not provide owner attestations.

Historical 13-gate receipts keep their original bytes, subject, timestamps and hashes. They remain historical evidence for the earlier scope and cannot approve the expanded matrix. Generate a fresh draft for the real candidate/artifacts; do not copy approvals or invent a PASS. This support reconciliation is neither an RC approval nor a production PKP upgrade.

Source and CI evidence​

Studio #877, OJS-plugin #34, OMP-plugin #26 and OMI #190 introduced the -6 compatibility extension. On 2026-11-07, the Studio six-target workflow, OJS plugin installation matrix and OMP plugin installation matrix succeeded for their own commits. These are historical inputs, not evidence for a later repair commit, a deployed server or a published plugin archive.

OJS -6 uses its official image. The OMP -6 application uses exact official source 9e2a7fd0054ca73e5f5a04c40fdcf9da2545dc6c, recursive submodules and locked Composer dependencies on the official -5 PHP/Apache runtime while the -6 Docker tag is unavailable. CI checks the actual application version; the runtime image is not advertised as an official OMP -6 image. Existing plugin download versions are unchanged; compatibility CI does not create a new release archive.

Architecture reconciliation​

Studio ADR-033 records alternatives, consequences and review conditions. The Target Architecture, Gap Analysis, Refactoring and PR Plan, ADR Register and Executive Summary use this support/evidence policy. C06–C09 and D08 retain connector/capability work; E02–E05 require the full automated matrix plus the fresh 14-gate receipt before promotion. The original 54 planned units are not renumbered or marked complete by this update. Revisit on a version/tier change or a new acceptance/distribution requirement.

Studio implementation PR #878.